Validation vs Verification
Validation checks a project's plan before it starts; verification checks its results afterwards.
Validation and verification are distinct stages. Validation assesses the project design — its baseline, methodology and monitoring plan — against requirements before the project begins or is registered.
Verification comes later, after the project has operated, and confirms that the reported results actually occurred and were calculated correctly. It is the step that enables credit issuance.
Keeping the two separate, and ideally performed by independent parties, protects against conflicts of interest and ensures both the plan and the results are sound.
Frequently asked questions
Which comes first?
Validation, which checks the project's design before it starts; verification checks results afterwards.
Why keep them separate?
They assess different things at different times, and independence protects the credibility of both.