Grid-Connected Renewable Generation — Large Scale (Combined-Margin Baseline)
Centralised renewable generation displacing grid electricity. Avoided emissions are computed from metered net generation against a combined-margin baseline grid emission factor.
About this methodology
The Grid-Connected Renewable Generation — Large Scale (Combined-Margin Baseline) profile (GRID-RE-L) is a Renewable Energy methodology profile used by the Athlas Verity engine to estimate and independently verify carbon outcomes for grid-connected solar, grid-connected wind, centralised renewable power plant. Centralised renewable generation displacing grid electricity. Avoided emissions are computed from metered net generation against a combined-margin baseline grid emission factor.
Athlas classifies this profile at Tier 2 — standard with high confidence. Estimates are derived from directly observable satellite signals, and a conservative uncertainty deduction of 10% is applied to net creditable volume. The profile sets parameterisation, dataset bundles and evidence requirements; the core accounting chain is shared across the platform.
Verification is evidence-led. A project mapped to this profile must supply 6 mandatory evidence items plus 1 optional supporting record. Athlas cross-checks the submitted project boundary and documents against 5 Earth-observation and ancillary data layers, then issues a tamper-evident verification report that can be reviewed independently.
How Athlas verifies this
- 1
1. Boundary & evidence intake
The project boundary (GeoJSON) is ingested and validated against the 7 evidence requirements defined for profile GRID-RE-L. Ownership, legality and truthfulness declarations are recorded for the audit trail.
- 2
2. Baseline reconstruction
Historical reference conditions are reconstructed from the COPERNICUS/S2_SR_HARMONIZED layer (B8, B4) using a median reducer at 10 m, giving a defensible counterfactual for grid-connected solar.
- 3
3. Satellite measurement
The primary signal is measured from ESA/WorldCover/v200 (bands Map) with a mode reducer at 10 m, combined with the remaining 4 supporting layers for terrain, moisture, climate and land-cover context.
- 4
4. Conservative accounting
Results are passed through the shared accounting chain using the profile's own parameters, then reduced by the profile uncertainty deduction of 10% to give a conservative, uncertainty-aware creditable volume.
- 5
5. Report & on-chain anchoring
A verification report is generated with a tamper-evident hash and anchored immutably, so the Renewable Energy result for GRID-RE-L can be independently reviewed and its retirement tracked.
Satellite & Earth-observation layers
| Role | Dataset | Bands | Reducer | Scale |
|---|---|---|---|---|
| site land cover | ESA/WorldCover/v200 | Map | mode | 10 m |
| vegetation baseline | COPERNICUS/S2_SR_HARMONIZED | B8, B4 | median | 10 m |
| solar resource(optional) | ECMWF/ERA5_LAND/MONTHLY_AGGR | surface_solar_radiation_downwards_sum | sum | 11132 m |
| wind resource(optional) | ECMWF/ERA5_LAND/MONTHLY_AGGR | u_component_of_wind_10m, v_component_of_wind_10m | mean | 11132 m |
| terrain | COPERNICUS/DEM/GLO30 | DEM | mean | 30 m |
Profile parameters & provenance
A calibrated default is not a standard value. Before a claim under this profile is marked verified, every calibrated default it relies on must be replaced or justified with project-specific measurement.
Grid emission factor used to convert displaced electricity into avoided CO2e. These are country-level defaults; a verified claim must replace them with the factor published for the crediting period by the grid operator or national inventory.
Weight of the operating margin in the combined margin factor.
Weight of the build margin in the combined margin factor.
Capacity factor for the generation technology when no production data is supplied.
Grid transmission and distribution losses applied when the claim is based on delivered rather than generated energy.
Crediting lifetime assumed for the plant. A methodological convention, not a physical property.
The value comes from the cited standard. A reviewer can open the document and check the number.
A defensible default drawn from the literature, not a standard value. It must be replaced or justified with project-specific measurement before the claim is verified.
A deliberate Athlas choice — a buffer, deduction or weighting. Not a scientific constant and never presented as one.
Required evidence
Project boundary (GeoJSON)
Required · accepts geojson, json, zip
Metering / generation records
Required · accepts csv, pdf, xlsx
Grid connection / power offtake agreement
Required · accepts pdf
Grid emission factor evidence (combined margin)
Required · accepts pdf, csv
Permits, legality & land status
Required · accepts pdf, jpg, png
Data truthfulness declaration
Required · accepts pdf, jpg, png
Project field photos (multi)
Optional · accepts jpg, png, webp
Verification workflow
Frequently asked questions
What is the Grid-Connected Renewable Generation — Large Scale (Combined-Margin Baseline) (GRID-RE-L) methodology profile?
It is a Renewable Energy methodology profile in the Athlas Verity library. Centralised renewable generation displacing grid electricity. Avoided emissions are computed from metered net generation against a combined-margin baseline grid emission factor. It applies to grid-connected solar, grid-connected wind, centralised renewable power plant and sets the parameters, satellite dataset bundle and evidence requirements used to verify a project mapped to it.
What evidence is required for profile GRID-RE-L?
Mandatory evidence includes: Project boundary (GeoJSON); Metering / generation records; Grid connection / power offtake agreement; Grid emission factor evidence (combined margin); Permits, legality & land status; Data truthfulness declaration. Optional supporting records such as Project field photos (multi) strengthen the assessment.
How does Athlas verify a GRID-RE-L project with satellites?
Athlas measures the project using 5 Earth-observation layers, including ESA/WorldCover/v200 (Map). Estimates are conservative: a 10% deduction is applied to net credits.
Which verification domain does GRID-RE-L belong to?
Profile GRID-RE-L belongs to the Renewable Energy domain. Projects are routed through the corresponding verification workflow and dashboard at the Renewable Energy verification area.
Related methodology profiles
Grid-Connected Renewable Generation — Small Scale
Solar Photovoltaic Generation
Wind Power Generation
Run-of-River & Small Hydropower
Biomass & Biogas Energy Generation
Mini-Grid, Captive & Off-Grid Renewable Electricity